University of Denver – Center for Data Analysis & Information Visualization, Denver, CO

AV Total – $170,000 Provide and install an Interactive Prysm Collaboration video wall (5×4 LPD tiles,117” diagonal) in Data Visualization Center for use in raising the institutional visibility of research performed at DU by collaborating with researchers on statistical analysis and information visualizations and educating DU learners and researchers about visualization and statistical analysis.  CCS…

University of Denver – Anderson Academic Commons, Denver, CO

AV Total – $400,000 Provide and install 60+ NEC LED monitors for use in small and large group study spaces using Chief LTMU Fusion tilt wall mounts, Crestron MPC-M5 controllers, Crestron HD-SCALERs, wall plates and cabling.  Provide and install Epson ProZ8000 LCD projectors, Da-Lite screens, NEC LED displays, Biamp digital signal processing, Cisco video tele-conferencing…

David C. Cook (previously Cook Communications), Colorado Springs, CO

AV Total – $190,000   Audio-Visual Integration in Chapel and Boardroom of David C. Cook publishing headquarters. Lifesize VTC systems integrated in all David C. Cook locations worldwide. Equipment integrated includes Shure and Revolabs microphone systems, LG monitors, JBL speakers, Vaddio cameras, BSS Audio and Extron. Rooms controlled with Crestron DigitalMedia. Contact: Byron Largent 719-536-0100…

Rio Tinto Minerals, Englewood, CO

AV Total – $200,000 LEED Silver Certified Design, build and integrate audio visual into Corporate boardroom, training rooms and conference rooms. This includes Integrating Polycom video conferencing systems and Smart interactive whiteboards to be controlled by a single Crestron control system. The boardroom projector and plasma were controlled via motorized lift. Contact: Ron Graeff 303-643-0434…

Colorado State University, Fort Collins, CO

AV Total – $98,000 LEED Gold Certified Audio-visual integration in large classroom and auditorium. Featured equipment includes Extron controls, Panasonic and Sanyo projectors, Biamp Nexia Series, Da-Lite screens, eBeam systems, WolfVison document camera, Shure microphone systems, Crestron controls, QSC amplifiers and Renkus-Heinz loudspeakers. Contact: Doug Satterfield, 970-491-6080 [email protected]


Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/485438.cloudwaysapps.com/mepkyewjgp/public_html/wp-includes/formatting.php on line 3506

Deprecated: preg_split(): Passing null to parameter #2 ($subject) of type string is deprecated in /home/485438.cloudwaysapps.com/mepkyewjgp/public_html/wp-includes/formatting.php on line 3506

Julie Penrose Health Education and Research Center, Colorado Springs, CO

Overall North Care Building Construction Total: $207 million Installation consisted of eight operating rooms at various hospitals and surgery centers in Colorado Springs and the JPHERC’s wet lab, auditorium, multi-purpose room, boardroom and a central control room. All connectivity to operating rooms is controlled from the JPHERC’s control room. In addition, the control room can…

Colorado Mountain College – 12 Campus Sites Throughout Colorado

Construction Standard – LEED Silver Certification Current AV Total: $2.9 million Extensive Audio/Visual Integration and Installation of 125+ Crestron controlled A/V systems with integrated SMART boards, several Campus auditoriums for speech and live performance events featuring Sound booth control systems for A/V and lighting, kitchen AV systems, and distance learning facilities for video conferencing applications.…

Western State College, Gunnison, CO

AV Total – $400,000 Pending LEED Gold Certification Overall College Center Construction Cost: $28 million Integrate and install a Christy Digital Cinema theater which would download and project first run movies via satellite. Equipped entire building with audio integrated with their network, paging and phone system. Integrated and installed audio and video systems for their…