AV Total – $400,000
Pending LEED Gold Certification
Overall College Center Construction Cost: $28 million
Integrate and install a Christy Digital Cinema theater which would download and project first run movies via satellite. Equipped entire building with audio integrated with their network, paging and phone system. Integrated and installed audio and video systems for their ballroom, student union and cafeteria to run separately and/or simultaneously. Designed and integrated boardroom with multiple microphones and LifeSize high definition video conferencing system. Equipment integrated includes: BiAmp Audia series, Extron Controls, Tannoy, JBL and SoundTube speakers, TOA and QSC amplifiers, Da-Lite screens, Epson and Christie projectors, Listen Technologies systems, Shure and Revolabs microphone systems and Lifesize high definition video conferencing system.